Quote:
Originally Posted by Rider
On a concrete slab I would only put a floating laminate with the moisture barrier/foam pad under it. I finished my entire basement with laminate with the exception of the bathroom which I installed tile. Real wood only on OSB/plywood stapled directly to the floor with only a thin moisture barrier under it.
|
Why wouldnt you put plywood down first? I had heard from others that if its a concrete slab that you had to put plywood down first. The room I am puttin git in is not realy a basement but is on a slab at ground level if that matters.
Tom