ceo012384 03-10-2008 02:39 AM

Quote:

Originally Posted by JoJoYZF (Post 8357)
Comin along nicely. What all is left? Just the floor, finishing the walls and hanging the doors?

See below :lol:
Quote:

Originally Posted by DLIT (Post 8395)
I'm pretty sure he still has around 300 pics to post up also.

Don't like it, don't look at the thread.
Quote:

Originally Posted by Captain Morgan (Post 8410)
I was wondering when you were going to bring this thread over. Glad to see it back up. I thought you were going to paint the insides of the doors white. Did you change your mind?

Thanks man. Yeah, I thought more about it and decided it would look funny, especially when I opened the doors. I think they look good this way.
Quote:

Originally Posted by Audiomechanic (Post 9641)
Great job, CEO! I'm a hobbiest wood worker myself so I appreaciate good work. The constuction of the doors looks very solid.

Thanks a lot man... yeah, they are very solid... and heavy!
Quote:

Originally Posted by Audiomechanic (Post 9683)
Now we just gotta get GasMan to continue his Phoenix thread. How bout it? I know I'd like to see what becomes of the chop!

plus1 to that.... even if he just has to start where he is now and not have all the previous info... I've enjoyed following that one.
Quote:

Originally Posted by papapoi (Post 9736)
So why is there a huge dent in your Bike??

Haha you almost got me you bastard.
Quote:

Originally Posted by vabarber2 (Post 10981)
Looking Good! Now quit messing around and put the finishing touches on it!!

I'm trying, eh? Cut me some slack!
Quote:

Originally Posted by Captain Morgan (Post 12003)
Get any work done on that beeyotch this weekend?

Yes sir, quite a bit :D






Got a lot accomplished yesterday and today. Also, I'll be able to work on it tomorrow (monday), friday, and next weekend. Hell yeah.


I got all the materials necessary for the small door: solid wood slab exterior door, exterior door jambs, lock set, hinges, and a kit with jigs to help you cut all your doorknob holes. I painted the door and jambs and let them to sit:

http://i243.photobucket.com/albums/f...2420Medium.jpg

http://i243.photobucket.com/albums/f...2422Medium.jpg

http://i243.photobucket.com/albums/f...2424Medium.jpg

I ripped out the old shitty door, and installed the new jambs.

http://i243.photobucket.com/albums/f...2439Medium.jpg

http://i243.photobucket.com/albums/f...2440Medium.jpg

Later sunday night I got the hinges on the small door, mounted it, and got the knob and lock all working great. It was dark so I didn't take more pics. The door still needs another coat of paint and I need to insulate around the frame with caulking and some other odds and ends. I'll get pics tomorrow.


Also, I found some hinges that would work for the large doors at a killer price. They are commercial grade 4.5" hinges with non-removable pins, ball bearing movement, nice thick metal for the plates, very beefy pin, and they were pre-primed for painting. Best of all, only 6 bucks a piece. It was a no-brainer. I got 6... maybe I only need four, but figured at that price I might as well overkill.

http://i243.photobucket.com/albums/f...2436Medium.jpg

http://i243.photobucket.com/albums/f...2435Medium.jpg

I attached the hinges via 5/16" lag screws for 6 of the 8 holes, and then 1 on each side is a through bolt to the other side. This was if someone wants to break it they can't just take out the bolts on the hinges. I mounted up the doors... shimmed them up into place and got two hinges attached with half the bolts on each... just to test the movement. Movement was smooth and felt great.

http://i243.photobucket.com/albums/f...2437Medium.jpg

http://i243.photobucket.com/albums/f...2442Medium.jpg



My plan tomorrow is to tidy up all my loose ends. Hopefully this can all be done in a day, but I'm not sure.

- Quick trip to the Depot for more paint and some bolts

- Finish all the small door odds and ends
---- Painting
---- Caulking/insulating
---- Weatherstrip on the bottom
---- Etc.

- Finish the big doors
---- Mount the other two hinges
---- Attach all lags/bolts
---- Attach the gate latch to connect the two doors
---- Rig up the cane bolt for the floor
---- Weatherstrip the entire opening
---- Attach weatherstrips/wipers for the bottom of the doors
---- Rubber strips over the gaps on the hinge sides
---- Paint hinges, frame, general trim around the doors

- Final drywall work
---- Small pieces by all the doors (big doors, small door, door to main basement)

- Clean the shit out of the place
---- Get rid of all random wood
---- Sweep floor
---- Organize all tools
---- Can now get rid of table, etc.

It's already starting to look less cluttered in there just from my moving the table out of the way:

http://i243.photobucket.com/albums/f...2444Medium.jpg

At that point, I will be ready to tackle starting the mudding, sanding, and painting next friday, saturday, and sunday.

Oh yeah, and I'm going for a god damn ride. The bike needs it, and I need it. It's suppose to be around 38. Good enough.

Mr Lefty 03-10-2008 03:20 AM

looks good slut... come to CO next year... you can build me a garage and I'll show you some sweet ass roads (I'll be finding them while your building said garage)

marko138 03-10-2008 10:15 AM

I've got that same Black and Decker door lock installer. Works really nice.

ceo012384 03-11-2008 02:54 AM

Quote:

Originally Posted by Ebbs15 (Post 12542)
looks good slut... come to CO next year... you can build me a garage and I'll show you some sweet ass roads (I'll be finding them while your building said garage)

I feel like this is not the best deal.
Quote:

Originally Posted by marko138 (Post 12634)
I've got that same Black and Decker door lock installer. Works really nice.

Yeah, considering it's just a plastic jig, I was pleased with how well it worked.







So I didn't get quite as much done today as I originally planned/wanted, but that's alright. I woke up late (needed the rest), had to ship some things, wanted to ride, and needed to organize the place quite a bit.

I finished drilling all the holes and installing all the bolts for the big doors. They open smoothly, and work great. They are all ready to be sealed up and all latches and such installed, all of which I have a plan for and have all the parts. I'll do that next time.

http://i243.photobucket.com/albums/f...2447Medium.jpg

Also, I realized I never posted pics of the outside concrete work. To fix all of the potential drainage problems due to the asphalt sloping toward the building, everything was re-done with concrete. This is also the reason for the low ceiling height, the floor in the garage needed to be at the asphalt level plus a little bit. You can see here all of the concrete built up against the building to encourage runoff. So far from what I've seen it all works great.

http://i243.photobucket.com/albums/f...2450Medium.jpg

http://i243.photobucket.com/albums/f...2452Medium.jpg

Then, I decided no matter what, I needed to ride. Went out for about two hours, hit some twisties, got the feel back, etc. It felt fucking great. About to head out:

http://i243.photobucket.com/albums/f...2449Medium.jpg

When I returned, instead of worrying about little trim work, painting and insulating the door frames, etc (all which would require a Depot trip), I decided to clean up and get organized. Also, this is due to the trash guy coming tomorrow... needed to get rid of some scrap. There was a TON of old and scrap wood. I cut it all into pieces to fit into barrels (the only way they'll take it). It filled up six trash barrels!

http://i243.photobucket.com/albums/f...2453Medium.jpg

http://i243.photobucket.com/albums/f...2455Medium.jpg

http://i243.photobucket.com/albums/f...2461Medium.jpg

Also, cleaned up garage. Some of the clutter were the makeshift 'tables' I had been using for work, which ended up in the pics above. Also, organized all the tools and swept up. That's a shitload of sawdust!

http://i243.photobucket.com/albums/f...2457Medium.jpg

Lots of space in there now that a lot of the shit is out. It's going to be so sweet when I'm done. Bike looks great in there, too ;) The tire tracks are from me test-fitting our jeep in there... if we needed it to fit, it does, barely. Wouldn't be worth it for everyday storage though.

http://i243.photobucket.com/albums/f...2466Medium.jpg

http://i243.photobucket.com/albums/f...2465Medium.jpg

http://i243.photobucket.com/albums/f...2462Medium.jpg

Gotta love the 'reverse chicken strips' due to the shitty weather... most of the tire all smoothed out from normal use, the edges ripped up from track use (tire temperature as well as harder accel at lean causes the shredding...)
http://i243.photobucket.com/albums/f...2467Medium.jpg

http://i243.photobucket.com/albums/f...2468Medium.jpg

Basically, everything is ready to go. Next time I go out, I will finish all the door insulation, weatherstripping, caulking, and painting. Then, I'll hang the last few small bits of drywall by the doors, and pull the bike and everything except for drywall stuff out of the garage. That should all take one day. Then, the next day the mudding and sanding will start. After that, it will just be painting, building shelves, and building a workbench. I've also got a few little finishing touches/surprises up my sleeve ;)

Mr Lefty 03-11-2008 03:23 AM

looks nice but WTF!? did you have Michael J Fox driving the jeep!? those tire tracks are wavy as fuck

OneSickPsycho 03-11-2008 08:32 AM

The low ceiling height shouldn't be a problem for your midget ass..

Gas Man 03-11-2008 09:06 AM

Will you be done by Sat? I should be riding mine Sat... unless the weather doesn't co-operate then I'll just be starting it.

ceo012384 03-11-2008 05:07 PM

Quote:

Originally Posted by Ebbs15 (Post 13562)
looks nice but WTF!? did you have Michael J Fox driving the jeep!? those tire tracks are wavy as fuck

:lol: that's some funny shit.

But yeah, the fit was wayyy snug... had to keep making minor direction adjustments. Had to pull in the mirrors too. It was just a test because I was curious. I doubt if it will ever be used for that probably.
Quote:

Originally Posted by OneSickPsycho (Post 13626)
The low ceiling height shouldn't be a problem for your midget ass..

Exactly. Anyone over 5'11" would have to duck for most parts.
Quote:

Originally Posted by Gas Man (Post 13654)
Will you be done by Sat? I should be riding mine Sat... unless the weather doesn't co-operate then I'll just be starting it.

That's awesome man! No, I won't... :(

vabarber2 03-11-2008 05:09 PM

FINISH IT!!! :lol:

Its looking good, and you've got a nice amount of room (other than cieling)!

Mr Lefty 03-12-2008 03:33 AM

Quote:

Originally Posted by ceo012384 (Post 14262)
:lol: that's some funny shit.

But yeah, the fit was wayyy snug... had to keep making minor direction adjustments. Had to pull in the mirrors too. It was just a test because I was curious. I doubt if it will ever be used for that probably.

Exactly. Anyone over 5'11" would have to duck for most parts.

That's awesome man! No, I won't... :(



well when you build mine... we'll need at least 10 ft side to side... and 8.5 ft clearance for the doors... so I can fit my truck in once it gets it's lift and 37" tires :drool:


All times are GMT -4. The time now is 07:58 PM.