From the outside, the place looks pretty good, if I do say so myself. Especially considering the doors I built cost about 3% of what I was quoted to have a set built.
Inside looked alright sat night:
Unfortunately I've got a shitty couple of weeks with work, this one and next week, so I'm not sure if I'll be able to get much/anything done for a bit
But I'm going to put Katherine to work when she comes to visit
Left:
- One small bit of trim work
- Mudding, sanding
- Clean the whole joint out, throw away scraps, etc to get ready for paint. Lay down plastic sheeting over the whole floor
- Priming, painting
- I want to use a baseboard that I can seal to the floor to make it waterproof. Since the place isn't that big I think I might splurge on these because they'll look fuckin' badass. Then I'll use clear caulking to seal the joint at the floor. Will make mopping the place really easy.

- Design and build workbench. Put a beer fridge under it.
- Build all shelving. The small room will be all shelves, and there will be shelves for the stereo.
- Set up tool chests, fill, organize, etc. In general organize the whole joint.
- Down the road, I want to do the epoxy flooring. We'll see when I get the money and time to do it.
I'm also going to tackle a job in the main basement as well, but that is a story for another day