View Single Post
Old 09-22-2010, 03:55 PM   #65
ontwo
Designated Drinker
 
ontwo's Avatar
 
Join Date: Jul 2008
Location: shitville
Moto: 2009 ZX6R
Posts: 1,661
Default

A couple of pics in the sun. Exhaust is back on. Electrical box installed. Still have some wiring to clean up. Battery box in place. Just ordered my new chain today. Scored a skatebaord wheel from the local shop to turn into my chain roller.



[hr]
Checklist of things left to do...

Chain roller
Hook up all electrical
Build tail light/tag bracket
Wire up tail light
Get chain on
Strip/clean tank. Bondo where the badges were.
Paint tank
Carbs and filters back on
Mount a pivot for rear brake lever
Clutch needs adjusting
Paint handlebars
Install grips
Order tires
Paint wheels/mount tires

It seems like there are a million small tasks on this project. I'm really enjoying it, though.
__________________
ontwo is offline   Reply With Quote