Go Back   Two Wheel Fix > Around the World > Southeast Riders > Florida Riders

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-03-2009, 10:09 AM   #34
AquaPython
put it THIS way
 
AquaPython's Avatar
 
Join Date: Nov 2008
Posts: 3,185
Default

spent the last 4 days busting my ass on my house. i am ready for my upcoming vacation!
pics coming shortly

in wall speaker system 99% done
walls patched , sanded and ready for primer , 80% done.
removal of "grandma's window treatment" done.
paint samples purchased , applied, paints selected. done.
removal of glass sliding doors. done.
removal of sliding door frames (which rest on an, internal / external concrete wall. done.

however the last one left a whole new side project:
filling in the gaping holes in the archways (2x) with joint compound. first coat applied.

and in the meantime, toilet broke, sink doesnt drain because there is no drain stopper and H dropped a toothpaste cap down it. im surprised it took a year for one of us to drop something....
so, new toilet fill valve. done.
new toilet lever, that doesnt flop around. done.
cut away old glued sink trap and replace with removable one. done.
install new sink drain stopper. done.

total so far $1004.29
__________________
Quote:
...it'd be like finding a human vagina on your unicorn. Literally fucking incredible.
AquaPython is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:43 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.