Go Back   Two Wheel Fix > In the Garage or Shop > Mechanical or Tech

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-05-2008, 12:39 AM   #6
ceo012384
Pompous Prick
 
ceo012384's Avatar
 
Join Date: Mar 2008
Location: MA
Moto: 06 R6 (race), 04 CRF Tard (race)
Posts: 3,040
Default

So in the past few days I've made some pretty decent drywall progress. The ceiling in both rooms is completely done, including boxing in the little spotlights. I started the walls, I've done the whole back wall in the main room, and half of the wall that interfaces the two rooms. Did a couple wiring things, added a dedicated outlet under the workbench for the minifridge,other odds and ends. There are a couple portions of wall that cannot be drywalled until later, because I have to design and build the garage doors, and design and build a door to replace the small door in the small room that goes to the outside.

Here's some shots of the progress:

Back wall, ceiling (notice that my 'work table' looks like I had a huge coke party ... gotta love drywall):


Side wall, ceiling with boxed in spotlights:


Ceiling:


Side wall, ceiling with boxed in spotlights:


Looking from the main room into the small room:


Looking from the small room into the main room:



Comin' along decently now that I've been able to put in a couple consecutive full days
ceo012384 is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 08:33 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.